Infiltration Tunnel

  • The Graf Infiltration Tunnel has been mainly designed for the use in private and rural areas
  • The system consists of one or several tunnel modules and two end plates. The system can be extended at will to any length
  • The system which consists of one or several tunnel modules and two end plates can be extended at will
  • The laying is realized in one or more lines of the same level
  • As the weight of one module is only 11 kilos, the handling of the Infiltration Tunnel is excellent
  • The surface beyond the tunnels is lorry-bearing which offers versatile possibilities
  • The infiltration tunnel can be loaded permanently up to 59kN/sqm and thus is also suitable for lorry-bearing
  • 5 years warranty
order no.QuantityLength (mm)Width (mm)Height (mm)Weight (kg)
230010 1 1160 800 510 11
Kyasol-infiltration-tunnel
All Devices
GO
Green with Kyasol

Get in touch with us

Kyasol is a proud member of the Green Building Council of South Africa (GBCSA) as well as the South African Energy Efficiency Council (SAEE).

Copyright © 2018 – All rights reserved. 

Designed by Cartmell.